LogoScaffold
PC
Procore
PG
PlanGrid
AB
Autodesk Build
BB
Bluebeam
S3
Sage 300
PC
Procore
PG
PlanGrid
AB
Autodesk Build
BB
Bluebeam
S3
Sage 300
AI Construction Writer · v2.4 Live

Feed Scaffold your raw RFIs, daily logs, and submittals. Get back publication-ready documents before the morning safety meeting. No editing required.

214 words
in 3.1 seconds
11 hrs saved
per week, per PM
50+ doc types
supported out of box
Scroll
Document Type 01

Daily Logs

Raw Field Note

crew showed up 7am except martinez called out sick again. poured slab B4 weather held up. foreman says rebar on grid 7 looks off need to check tomorrow. crane operator had issue with outrigger pad soft ground delay ~45min. lunch 11:30. afternoon framing crew finished 3rd floor west bay. minor cut on hand from formwork, first aid only no report. 6 guys OT approved

Scaffold Output
DAILY LOG — February 27, 2026 | Riverview Tower, Phase 2

Crew Attendance: 24 of 25 crew on site. J. Martinez absent (personal). OT approved for 6 personnel.

Work Completed:
• Slab B4 concrete pour completed — weather favorable, no interruption
• 3rd floor west bay framing — 100% complete

Delay: Crane operations delayed ~45 min (soft ground at outrigger pad, Grid 7). Corrective action: additional timber mat installed.

Safety Incident: Minor laceration, right hand, formwork (first aid only). No lost time. OSHA 300 log updated.

Pending Action: Rebar alignment inspection, Grid 7 — scheduled 02/28.
Document Type 02

Bid Proposals

Raw Field Note

concrete scope for the parking garage. 3 levels underground. walls footings and slabs. need to include pumping because the site is tight. assume normal mix design unless geotech says otherwise. bond form attached. we use union labor. prevailing wage project. need it by friday

Scaffold Output
SCOPE OF WORK — Concrete Package
Project: Meridian Parking Structure | Bid Date: March 3, 2026

1. SCOPE INCLUSIONS
Furnish all labor, material, equipment, and supervision for cast-in-place concrete: spread footings, pile caps, retaining walls (3 below-grade levels), SOG, PT slabs, and elevator pit.

2. MIX DESIGN
Per structural drawings; 4,000 PSI standard unless geotechnical report requires modification. Contractor to review geotech prior to bid finalization.

3. MEANS & METHODS
Concrete pump required — site constraints preclude direct chute placement.

4. LABOR
All work performed under applicable union agreements. Prevailing wage rates apply per project requirements.

5. EXCLUSIONS
Reinforcing steel, post-tension tendons, waterproofing, formwork engineering stamps.
Document Type 03

Safety Reports

Raw Field Note

toolbox talk today about fall protection. reminded guys about 6ft rule. showed them the new harness inspection checklist. one harness failed D ring stitching removed from service. asked about tie off points on the east scaffold and nobody was sure so we walked it. found 2 missing guardrails on level 4. fixed before end of shift. no incidents

Scaffold Output
TOOLBOX TALK RECORD
Date: 02/27/2026 | Topic: Fall Protection — Active Hazard Review
Attendees: 18 | Conducted by: Site Safety Officer

TOPIC COVERED
Fall protection requirements: OSHA 1926.502 — 6-ft trigger height, 100% tie-off mandate above floor openings.

EQUIPMENT INSPECTION
Harness Removed from Service: 1 unit — D-ring stitching failure. Tagged and quarantined. Replacement issued same shift.

HAZARD IDENTIFIED & CORRECTED
Location: East Scaffold, Level 4
Hazard: 2 missing guardrail sections (top rail and mid-rail)
Correction: Guardrails reinstalled before end of shift 02/27
Verified by: Foreman signature on file

INCIDENTS: None

Next Scheduled Talk: 03/06/2026 | Topic: Struck-By / Crane Exclusion Zones
Document Type 04

RFI Responses

Raw Field Note

RFI 047 - the structural drawings show a W18x50 at grid C-7 but the architectural shows a 10 inch wall and there isnt room for the beam flange plus drywall plus the column. architect needs to either move the wall or we need a different beam. this affects framing on level 3 and 4. need answer by wednesday or we lose the crane

Scaffold Output
RFI No. 047
Project: Harborview Mixed-Use | Date Issued: 02/27/2026
Discipline: Structural / Architectural Coordination
Priority: CRITICAL — Response Required by 03/01/2026

SUBJECT: Beam-to-Wall Conflict, Grid C-7, Levels 3–4

DESCRIPTION OF CONFLICT
Structural drawings (S-204) indicate W18×50 at Grid C-7. Architectural plan (A-301) shows 10″ partition wall at same location. Available clearance is insufficient to accommodate beam flange width (8.99″) + wall framing + finish drywall (GWB each side).

REQUESTED RESOLUTION (select one)
☐ Option A: Relocate partition wall per architectural revision
☐ Option B: Substitute reduced-depth beam (coordinate with EOR)
☐ Option C: Recess beam into wall — structural adequacy confirmation required

SCHEDULE IMPACT
Level 3–4 structural framing on hold pending response. Crane demobilization scheduled 03/03/2026. Response required by 03/01/2026 to avoid standby costs.
Document Type 05

Submittals

Raw Field Note

submittal for the roofing membrane. its a TPO 60 mil from carlisle. shop drawings attached. the spec section is 07 5400. need architect stamp. this is for the main roof only not the mechanical penthouse. install starts in 3 weeks if approved

Scaffold Output
SUBMITTAL TRANSMITTAL
Submittal No.: 07-5400-001
Date: 02/27/2026 | Spec Section: 07 5400 — Thermoplastic Membrane Roofing

PRODUCT SUBMITTED
Manufacturer: Carlisle SynTec Systems
Product: Sure-Weld® TPO Membrane, 60-mil
Application: Main roof assembly only (mechanical penthouse excluded — separate submittal to follow)

DOCUMENTS INCLUDED
☑ Product data sheets (3 pp.)
☑ Shop drawings — Roof plan with membrane layout, lap locations, drain details
☑ Manufacturer's installation guide (current edition)
☑ Contractor certification of installer qualification

ACTION REQUESTED
Architect review and stamp — approved, approved as noted, or revise and resubmit.

SCHEDULE NOTE
Installation mobilization planned 03/20/2026. Submittal approval required by 03/13/2026 to maintain schedule. Expedited review appreciated.

Submitted by: Project Manager | Cascade Roofing Contractors
Live Demo — No Account Required

Paste anything. Watch it become a document.

Drop in your roughest field note. Scaffold returns a publish-ready document in under 5 seconds — every time.

Your Field Note
181 chars
Scaffold Output
Output will stream here character by character…

Demo runs locally in your browser. No data is sent to any server.

The field doesn't lie.

Real numbers from real contractors. No case study fluff.

11 hrs/week saved
"We cut documentation time by 11 hours a week per PM. That's not a rounding error — that's a full employee day back every single week."
Marcus Delgado, project manager in hard hat on construction site
Marcus Delgado
Senior Project Manager · Irongate General Contractors
$40K in bid hours recovered
"My estimators used to write scope descriptions at 11pm. Now I get a draft in my inbox before the site walk ends. Scaffold paid for itself in the first bid."
Brenda Tran, estimator reviewing construction documents at desk
Brenda Tran
Chief Estimator · Pacific Ridge Construction
50+ updates/week, zero rewrites
"We run 50+ subcontractor updates a week across three GC relationships. Scaffold keeps the brand voice consistent even when six different foremen are feeding it notes."
Darnell Washington, VP of operations in construction office reviewing project plans
Darnell Washington
VP of Operations · Summit Build Group
0 RFI revisions, 3 months straight
"First RFI response I sent through Scaffold came back from the architect with zero comments. First time that's happened in my 14 years in the field."
Catalina Ruiz, superintendent standing on construction site with safety vest
Catalina Ruiz
Superintendent · Highmark Structures
Available Now · iOS & Android

Install on Your Jobsite

Your crew is already on their phones between pours. Now those phones write the paperwork.

SOC 2 Type II
End-to-end encrypted
CCPA compliant
4.9 / 5 on App Store